Students extend their understanding of functions to rational functions by exploring average cost. They gain experience in moving between a problem context and its mathematical model in order to solve problems and make decisions.
At the You’re Toast, Dude! toaster company, the weekly cost to run the factory is $1400 and the cost of producing each toaster is an additional $4 per toaster.
Have students discuss the mathematical parameters/limitations of x, C(x), and P(x) compared to real-life limitations of the mathematical model for the particular situation.
Ask students to consider what happens at extremely large or small values of x, extending the mathematical discussion to asymptotes. Ask students to find the asymptotes of the production cost per toaster.
As the number of toasters, x, nears 0, the total production cost per toaster gets larger. For example, when x = 10 toasters, the total production cost per toaster is $144. When x = 5, the total production cost per toaster is $284. When x = 0 the function cannot be solved for P(x).
As the number of toasters, x, becomes larger and larger, the average cost per toaster nears $4. For example, when x = 5,000 toasters, the average cost per toaster is $4.28. When P(x) = 4 the function cannot be solved for x. The horizontal asymptote of the function is y = 4, and the vertical asymptote is x = 0.
C(x) = 4x + 1400
C(100) = 4(100) + 1400 = 1800
It will cost $1800 to produce 100 toasters in one week.
1800 / 100 = 18. If 100 toasters are produced the total production cost per toaster is $18.
No. Justifications may vary. If 200 toasters are produced in one week, the cost is C(200) = 4(200) + 1400 = 2200. The total production cost is $2200 / 200 = $11 per toaster. Since $11 does not equal $18, the total production cost per toaster is not the same when the number of toasters produced varies.
P(x) = (4x + 1400) / x or P(x) = 4 + (1400/x) or P(x) = C(x)/x
If 300 toasters are produced, the total production cost per toaster is $8.67.
If 500 toasters are produced, the total production cost per toaster is $6.80.
As the number of toasters produced increases, the total production cost per toaster decreases. Looking at the graph will show that as x increases, y decreases. In addition, looking at the table of values in the graphing calculator you can see that as the x values increase, the y values decrease.


The viewing window above shows that the intersection of y = 4 + (1400/x) and y = 8 is the point (350, 8). Therefore, when 350 toasters are produced in one week, the total production cost per toaster is $8.